Tuesday, December 21, 2010

Chlorination plant

  1. Water supply 
  2. Water absorption tower
  3. Control Panel
  4. Chlorine cylinder 

Method od conveying water

The supply of water from intake to the consumer is in stages :
  1. From intake to treatment plant
  2. From treatment plant to service reservoir 
  3. From service reservoir to consumer ( users )
Distribution of water
  • Water tower to supply buildings too high to be served by service reservoirs 
  • Building rising above level of mains head
  • Minimum head is 30m below the service reservoir

No comments:

Post a Comment