- Water supply
- Water absorption tower
- Control Panel
- Chlorine cylinder
Method od conveying water
The supply of water from intake to the consumer is in stages :
- From intake to treatment plant
- From treatment plant to service reservoir
- From service reservoir to consumer ( users )
- Water tower to supply buildings too high to be served by service reservoirs
- Building rising above level of mains head
- Minimum head is 30m below the service reservoir
No comments:
Post a Comment