Tuesday, January 11, 2011

bakau piles

  1. Allow for provision of all necessary piling equipment , tool and ancillary equipment including transportation to site , handling , assembling and removal off site after completion of the piling works. 
  2. Allow for maintaining , moving and handling all necessary piling equipment on the site and porviding staging to different platform levels as may be requirted , as often and whenever necessary for the whole operation including excavations , filling to make up levels , install piles on embankments or slopes and idling time , etc.
  3. Supply , deliver , unload , handle , transport , heading , pointing , and pitch for driving of 75mm diameter bakau piles to the required set .
  4. Drive olny 75mm diameter bakau piles connection , including 5mm thick mild steel sleeve to the approval of the S.O.
  5. Extra over interlocking steel piles for conrner piles
  6. Cut off U-type Section FSP IIA interlocking steel sheet piles to form holes 100mm diameter at 500mm center to center. 
  7. Cut off u-Type Section FSP IIA interlocking steel sheet piles heads at required level ;including remove surplus length and debris from site 
  8. U-type Section FSP IIA interlocking steel sheet ples connection including mild steel plate and bituminous paint to the approval of the S.O. 
  9. Allow for provision of all necessary pilling equipment , tool and ancillary equipment including transportation to site , handling , assembling and removal off site after complation of the piling .

No comments: