Piling ( bakau piles )

  1. Allow for maintaining moving and handling all necessary pilling  equipment plant , tool and ancillary equipment on the site and providing staging to different platform levels as may be required , as often and whenever necessary for thw whole operaton including excavation , fillings to make up levels , install piles on embankments or slopes and idling time etc. 
  2. Supply , deliver , unload , handle , transport , pointing and pitch for driving of 75mm diameter bakau piles , 6.00m long initial piles . Complete with 4mm thick 0,85 kg mild steel pyramid shapes piles shoes , including all necessary wrought from protective rings . ( Nr )
  3. Drive olny 75mm diameter bakau piles to the required set 
  4. Supply deliver unload handle transport  , heading , pointing and pitch for driving of 75mm diameter bakau piles of extension piles including for ple length exceeding 3.00m necessary wrought iron protection rings . 
  5. 75mm diameter bakau piles connection ,including mild steel sleeve to the approval of the S.O . 
  6. Cut off 75mm diameter bakau piles heads at required level , including removed surplus length and debris from site . 
  7. Preparing 75mm diameter bakau piles heads at cut off level to band into pile caps . 
  8. Carry out initial static load test on 75mm diameter bakau piles by keutledges to total load of 325kN 12.5 times of the winrking loads , including bring to side for testing purpose all calibrated instrument equipment , kentledge , labour and remove the same on competition .