Tuesday, January 11, 2011

site clearance

1.Clearing site of undergrowth bushes ,scrub and including grubbing up their roots and removing from site .

2. cuttting down tree not exceeding 300mm girth at 1.00m above ground level and grubbing up their roots and filling voids left by the material arising from excavation

3. Removing from site existing tree stump not exceeding 300mm girth at 1.00m above ground level and grubbing up their roots and filling voids left by the material arising from excavation

4. Removing hedges average 350mm high and grubbing up their roots and filling voids left by the material arising from excavation .

No comments:

Post a Comment