Tuesday, January 11, 2011

piling

  • Supply , deliver , unload , handle , transport , heading , pointing , and pitch for driving of 75mm diameter bakau piles of extension piles including all for pile length exceeding 3.00m necessary wrought iron protective rings ( In 80 Nos )
  • Drive olny 75mm diameter bakau piles to the required set . 
  • supply , deliver unload , handle , transport , heasing , pointing , and pitch for driving of 75mm diameter bakau piles of extension piles including all for pile length exceeding 3,00m necessary wrought iron protective rings ( in 80 Nos )
  • 75mm diameter bakau piles connection , including 5mm thick mild steel sleeve to the approval of the S.O.
  • Cut off 75mm diameter piles head at required level , including remove surplus lengths and debris from site . 
  • Preparing 75mm diameter bakau piles head at cut off level to bond into piles caps ( measure separately ) 
  • Carry out initioal static load test on 75mm diameter bakau pules by kentledges to total load of 325kN ( 2,5 times of the working load ) , including bring to site for testing purpposes all calibrated instrument , equipment , kentledge , labout and material and remove the same on completion .